Opening of Nippori-Toneri-Liner
■ Overview
- ○Operation zone
・Nippori Station - Minumadaishinsuikoen Station
○Operating distance
・9.7km
○Number of stations
・13 stations
○Train cars
・5 cars × 16 formations
○Shortest driving distance
・4 minutes
○Cheapest fare
\160 (adults)/\80 (children)
■ Period of Implementation
■ Features
- ○Introduction of the new traffic system
・Means of transportation, which has the transportation capacity at the intermediate degree between a bus and a train.
・Run the raised exclusive track over a road along the guide rail using rubber wheels.
・Reduction of the operation costs by automatic operation using the ATO (Automatic Train Operation).
■ Outcomes / Achievements
- ・Opening of this line has dramatically improved the transport access in the local area along the line and has contributed to the mitigation of traffic congestion and the activation of the local area.
- ・During FY2011, nearly 61,000 customers on average per day used this service.
■ Cost
- 36.4 billion yen (construction cost by Bureau of Transportation)
※This figure excludes the cost by Bureau of Construction.
■ Inquiries
- Planning and Coordination Section, General Affairs Division, Bureau of Transportation
(Tel.) 03-5320-6011
(Mail Address) S2000008@member.metro.tokyo.jp
■ Related Links
|